Heers & Brockstedt Umwelttechnik GmbH
Solid waste landfill in Vinnytsia (construction phase I,II)
Project on Landfill Gas Capture with Energy Recovery
Solid waste landfill in Vinnytsia (construction phase III - V)
Project on Landfill Gas Capture with Energy Recovery
Solid waste landfill in Kremenchug
Landfill Gas Capture Project
Solid waste landfill No. 1 in Zaporozhye
Landfill Gas Capture Project on Solid Waste Landfill no. 1
 
Services

Construction of new and rehabilitation of closed solid waste landfills as well as engineering of sewer pipelines and channels according to EU standards



• Adaptation of EU standards to Ukrainian conditions and customer needs to reduce environmental load within existing financial frames.
• Use of home-produced shafts and construction elements from polymeric materials, such as polyethylene of high density or polypropylene.



Outgassing of solid waste landfills



• Wide range of services from predesign study (planning) to service over the whole lifecycle of the project;
• Use of the equipment of own production:
    - gas gathering points,
    - condensate tanks;
• Power supply into grid on a "green" tariff;
• Registration of the JI projects and the guaranteed sale of CO2-quotas in the carbon emissions market.

 


Construction of biogas complexes



• Production of biogas from organic waste of the agricultural and food industry;
• Use of the equipment of manufacturing partners:
    - High-temperature torch,
    - Cogeneration power plants,
    - Technical control unit of biogas installation;
• Power supply into the grid on a "green" tariff; registration of the JI projects and the guaranteed sale of CO2-quotas in the carbon emissions market.

   
Copyright © 2011 AEU все права защищены
Design AK