Heers & Brockstedt Umwelttechnik GmbH
Solid waste landfill in Vinnytsia (construction phase I,II)
Project on Landfill Gas Capture with Energy Recovery
Solid waste landfill in Vinnytsia (construction phase III - V)
Project on Landfill Gas Capture with Energy Recovery
Solid waste landfill in Kremenchug
Landfill Gas Capture Project
Solid waste landfill No. 1 in Zaporozhye
Landfill Gas Capture Project on Solid Waste Landfill no. 1
 
Equipment
  Shaft, pump and storage constructions

Factory-prefabricated and ready to install PEHD/EL  built constructions according to static requirements for project-specific  application profiles ,  taking into consideration SKZ/TÜV – LGA  quality guidelines "Pipes, pipework components, shafts and construction components for Solid Waste Landfills"...

Learn more »

     
  Pull heads of gas-collecting wells

Quality Assurance System  in accordance with  valid DVS (German association  for jointing) guidelines and directives and related documentation. Systems of gas wells with specially developed compressed air pumps to minimize the formation of leachate impounding in the landfill body...
 
Learn more »
     
  Gas collecting stations

Electro conductive internal coating and internal equipment, including potential equalization technology and lightning protection.
Adapters for the pipeline system to minimize shrinkage processes in the landfill  body...

Learn more »
     
  Condensate shafts

Professional construction and design with uplift restraint in accordance with static requirements.
Quality Assurance System  in accordance with  valid DVS (German association  for jointing) guidelines and directives


Learn more»
     
  Special structures and systems for leachate recirculation

CAD-supported development and construction of structures and systems up to DN 3500. 
Project-specific application profiles.
Functional interior design according to GUV R-127…

Learn more »
     
  Shaft renovation technologies

Renovation of shafts by means of inbuilt PEHD inliner shafts with minimum reduction of actual shaft dimensioning. Connection to the existing system of pipelines including related civil engineering services...

Learn more »
     
  Compressed air pumps

Fully automatic operation without any separate level regulation ;
Declining of actual water level  below  1, 00 m;
Explosion protection ensured by self operation;
High corrosion resistance...

Learn more »
     
  Oil barriers

Production, delivery and installation of oil barriers made of synthetic materials;
Project-specific CAD –supported design and variable constructions  for the corresponding field of application...

Learn more »
     
  Floating jetty systems

Floating jetty systems of PEHD design offer compared to models from wood and steel an ageing- and corrosion resistant alternative.
Floating bodies are made of PEHD pipes and additionally strengthened with plastic braces...

Learn more »
     
  Combined heat and power plants (CHP units)

Manufacturing of cogeneration units from 50 to 2000 kWel;
Ready for connection modules: from Genset to CHPs to container solutions as well as turn-key energy facilities;
User-tailored special solutions…

Learn more »

     
   